Skip to the timeline
Let's go to Mars

Filed under

orbit

6 milestones, in chronological order.

  1. c. 150 CEAncient Eyes

    Ptolemy's equant makes Mars predictable

    To fit Mars, Ptolemy let it sweep its circle at a steady rate around a point that was not the centre — a cheat that broke Greek doctrine and worked for 1,400 years.

  2. 499 CEAncient Eyes

    Aryabhata fixes Mars's year to within half an hour

    The Aryabhatiya assigns Mars 2,296,824 orbits per 4,320,000-year cycle. Work it through with his own day count and the period is 686.9997 days; the modern value is 686.98.

  3. 877–1375 CEAncient Eyes

    Islamic astronomers take the equant apart

    Al-Battani re-measured every planetary motion, Ibn al-Haytham argued the equant was physically impossible, and Ibn al-Shatir built the models Copernicus would mirror.

  4. 1543Ancient Eyes

    Copernicus explains Mars's backwards loop

    De revolutionibus turned Mars's retrograde loop into a trick of perspective — Earth overtaking it on the inside. The predictions were no better than Ptolemy's.

  5. 1609The Telescope Era

    Eight arcminutes of Mars break the perfect circle

    A stubborn eight-arcminute gap between Tycho's Mars positions and every possible circular orbit forced Kepler to the ellipse, and rebuilt astronomy around it.

  6. Every 779.9 days — windows in 2026, 2028–29 and 2031The Road AheadPlanned

    The 26-month clock that governs everything

    Earth and Mars line up for a cheap transfer once every 779.9 days. A six-week hardware delay does not cost six weeks; it costs more than two years.

Other tags